View Single Post
(#20 (permalink))
Old
siokan's Avatar
siokan (Offline)
JF Old Timer
 
Posts: 395
Join Date: Aug 2009
Location: solar system,2ch
Hokuriku Electric Power Company - 03-15-2011, 03:30 AM

%E9%9B%BB%E5%8A%9B%E4%BC%9A%E7%A4%BE%E4%BA%8B%E6%A5%AD%E5%9C%B0%E5%9F%9F%E5%9B%B3[1].png

50Hz
Gray:Hokkaido Electric Power Company
Brown:Tohoku Electric Power Co., Inc.
red:Tokyo Electric Power Company, Inc

Others 60Hz


Power transmission line

                Hokkaido
                    ↓↑0.6millio n kw
                  Tohoku(Stricken area)
                    ↓↑6million kw
West Japan 1million kw→Tokyo(Stricken area)
(60Hz area)

Usual dump power exceeds the transmission capacity in West Japan and Hokkaido.
Power insufficient in a red area is 10million kw.


Please permit poor English. orz
Cryptanalysis is necessary for you.
set a goal:English at the same level as Johan Cruyff

Last edited by siokan : 03-15-2011 at 04:01 AM.
Reply With Quote